Monday, August 27, 2007

Updates to the Hill (BTW CB14 and CB15)

Well, I sat down to work on my current building (CB 14) but as I had said before I was going to work on the hill behind in tandem with the building, since CB15, CB14, and the hill all are elements in a large part of the shot. After working out the dimensions with my stand-in scene (mentioned here) I roughed in the hill and built a walkway which passes through the space between the 2 buildings. I also added a short wall almost at the top of the hill, just to extend to depth of the scene.

All of these details need refinement so, this is still just a rough blocking in of the next level of detail and composition.

The renderings here show the refined area.







No comments: